Capital Cost Optimization On Gas Fired Power Projects Through Standardization
This paper discuss the practical approach on design standardization to achieve capital cost reduction in setting up Power plants in US.
|
Anil Godhawale
|
|
Application to Critical Chain on high value petrochemical projects
This paper examines the practical application of the critical chain philosophy in the project management of high value petrochemical projects.
|
John Welsh
|
|
Primavera P6 Version 7 Bars formatting presentation.
The P6 bar defaults may be misleading. For example
the Baseline bars and the Negative Float bar have the same colour and are on the
same line, the Level of Effort bars are not displayed and completed activities show
Total Float. This presentation outlines changes to the Primavera default bar formatting
that should be considered and as a result your schedule should be clearer.
|
Paul E Harris
|
|
What Primavera P6 Baseline Bars am I Displaying?
The aim of this presentation is to explain the
different types of project schedule Baselines, how the Planned Dates are calculated,
why the Planned Dates often display irrelevant data, the issues with the Planned
Dates, what functions control the display of the Planned Dates as Baseline Dates,
and how to ensure you have the Baseline dates and not the Planned Dates displayed
as Baseline Bars.
|
Paul E Harris
|
|
A Step-By-Step Guide Using Software Development Kit (SDK) for Primavera Version
6.X schedule preparation
By: Jeoffrey B. Reyes Sr.Planning Engineer Building
Works / Road & Infrastructure Jubail Industrial City, K.S.
|
Paul E Harris
|
|
Importing Microsoft Project 2003 – 2010 files into Oracle Primavera P6
Version 7.
Microsoft Project and Oracle Primavera P6 Version 7 calculate
differently. It is unlikely that a schedule will calculate the same dates and other
values such as durations and resource data in both packages unless the schedules
are very simple or a large amount of manual manipulation is applied after conversion.
|
Paul E Harris
|
|
|
Cashflowing with Expenses in P6 by importing for an excel spread sheet.
- Presented by Paul E Harris at the Insync10 conferance
in Melbourne August 2010.
|
Paul E Harris
|
|
Primavera Bars Tricks and Traps.
The defaults setting for the display of bars in Primavera
P6 can be greatly improved with some formatting, this presentation outlines the
issues and solutions.
|
Paul E Harris
|
|
Issues and Solutions facing Construction Contractors Implementing Primavera
P6
Presented by Paul E Harris at the PRIMAVERA09 Peak Project
Performance conference in Melbourne. (633KB - June 2009 )
|
Paul E Harris
|
|
Asta Power Project to Primavera Version 5.0 Import and Export
Some notes written by Paul E Harris on the process
of exporting schedules from Asta PowerProject to Primavera Version 5.0 (449 KB -
July 2007)
|
Paul E Harris
|
|
Primavera P3 and Tilos data Interchange
A paper written by Paul E Harris on the import
and export of data between Asta Tilos, a Linear scheduling software package from
Germany. (1,356 KB - July 2007)
|
Paul E Harris
|
|
Theta Planning:
This document has been compiled by Andrew Dick
to assist in setting up a Primavera Enterprise project to enable resource scheduling
to be achieved. (4,966 KB - July 2007). Click here to download associated XER
files.
|
Paul E Harris
|
|
Asta Power Project - An introduction
This document is designed to assist people who are using
SureTrak, P3, Primavera Enterprise or Microsoft Project to learn the basics of PowerProject
to create an unresourced schedule. (1,525 KB - Updated July 2009v)
|
Paul E Harris
|
|
Using P3 Batch to Rebuild Corrupt P3 Files
The process used by Paul Harris to rebuild corrupt
files. This is a zip file that includes instructions and bat files. ((32KB - July
2007)
|
Paul E Harris
|
|
Importing and Exporting data to and from P3 using Excel and DBF format
This is a step by step guide on how to complete
this process. (278 KB - June 2007)
|
Paul E Harris
|
|
Comparison of EVM Standards:
The comparison of AS4817 Project performance
using Earned Value 2006, ANSI/EIA-748-A-1998 Earned Value Management Systems and
PMI Practice Standard for Earned Value Management (163 KB - 3 July 2006)
|
Paul E Harris
|
|
Guidelines for training people in using Planning and & Scheduling software:
The aim of this paper is to outline some guidelines
for organizations to structure their training as part of implementation of Planning
and Scheduling software for the planning and control of projects. (151 KB - May
2005)
|
Paul E Harris
|
|
Guidelines for Implementing P&S Software
The aim of this paper is to outline some guidelines
for organizations to use when looking at implementing a corporate project planning
and scheduling system. Many of these guidelines equally apply to the implementation
of a stand alone planning and scheduling system. ( 314 KB - April 2004)
|
Paul E Harris
|
|
Practical Application of Earned Value Performance Measurement Using P3
The aims of this presentation is to review practical
methods that may be used for managing projects using Earned Value Performance Measurement
methods.(307 KB)
|
Paul E Harris
|
|
Book Review Guide
A guide for people writing books reviews (158
KB - September 2003)
|
Paul E Harris
|
|
SureTrak % Calculation
This article explains how SureTrak calculates
percent complete in the various fields available. ((102 KB)
|
Paul E Harris
|
|
Linking P3 Database with Excel or Access:
This article demonstrates how a P3 schedule
database may be linked to Excel or a dbf file using the Pervasive ODBC drivers.
(278 KB)
|
Paul E Harris
|
|
Techniques for Managing Complex Projects with Planning and Scheduling Software
This paper will discuss techniques that may
be used for developing and managing schedules that have a large number of activities
and a number of complex relationships. (246 KB)
|
Paul E Harris
|
|
Converting P3 and SureTrak files to and from Microsoft Project
This article looks at the various methods of
converting files to and from Microsoft Project and P3 or SureTrak. (226 KB)
|
Paul E Harris
|
|
Selecting Project Management Software
This article is aimed at assisting companies
in the process of selecting new project management software but could be applied
to the selection of many other types of software. (28 KB)
|
Paul E Harris
|
|
Issues and Solutions facing Construction Contractors Implementing Primavera
P6.
Presented by Paul E Harris at the myPRIMAVERA09
Peak Project Performance conference in Melbourne. (633KB - June 2009 )
|
Paul E Harris
|
|