Cost Scheduler Engineer

Cost Scheduler Engineer

Company:Popham Walter Odusote Ltd
Email: schigbufue@pwoarch-ngr.com
Career Level:Internship
Desired Education:NA
Number of Position:1
Travel:25%
Work Experience:7
Company Benefits:Private Health Insurance;
Job Type:Contract to Hire
Document: NA
Salary: $
Sub-Saharan Africa Nigeria Lagos
Contract to Hire
Apply before: 09 Feb, 2011

About this job

Popham Walter Odusote Ltd is an international consultancy company providing Design Engineering and Management services in infrastructure, water, environment and Construction and is currently seeking a Cost Scheduler to join their consultancy team. Reporting into the Project Controls group, the incumbent will be responsible for various costing and scheduling duties particular to the projects assigned. Responsibilities: • Cost and schedule management for project assignment • Prepare schedule and cost reports for projects • Prepare and analyze cost reports and costing audits • Examine and review unusual cost records and ensures cost data is allocated correctly • Produce monthly reports related to the position • Perform and ensure an effective cost control function • Interpret contracts and manage financial risk, estimating and forecasting • Maintain current cost control database. • Review proposed schedule changes with construction personnel, client and contractors. Requirements: • Technical Diploma or Degree, significant EPC or EPCM industry experience will also be considered • Advanced knowledge of Cost and Estimating software generally used on major engineering projects; Timberline, Prism, Primavera, etc. • Experience in the evaluation of contractors' baseline schedule and cost-loaded schedule, evaluation of cost impacts for contractor recovery schedules and the tracking of project costs to contract closeout • Pipeline Construction experience is desired • Motivated self starter • Able to work in a fast paced and rapidly changing environment • Effective interpersonal communication and organizational skill • Must be fluent in English both written and oral.

* There have been 0 Job applications
* This job opening has been viewed 928 times