Project Controls Manager

Project Controls Manager

Company:Popham Walter Odusote Ltd
Email: schigbufue@pwoarch-ngr.com
Career Level:Internship
Desired Education:NA
Number of Position:1
Travel:None
Work Experience:7
Company Benefits:Private Health Insurance;
Job Type:Contract to Hire
Document: NA
Salary: $
Sub-Saharan Africa Nigeria Lagos
Contract to Hire
Apply before: 09 Feb, 2011

About this job

Popham Walter Odusote Ltd is an international consultancy company providing Design Engineering and Management services in infrastructure, water, environment and Construction and is currently seeking a Project Control Manager Position responsibilities include, but are not limited to: • Responsible for the preparation and management of project cost estimates, budget and forecast reporting and control, commitment and expenditure monitoring and analysis, variance reporting, and status reporting in accordance with the client's Project Management Manual, policies and procedures • Responsible for the development of an overall Positive Train Control (PTC) Program Master Schedule and utilizing this schedule to prepare and manage critical activity updates and prepare schedule fragnets necessary for work around analysis • Also, responsible for the establishment and maintenance of the Document Control system as a centralized repository for PTC documents that is readily accessible by all authorized users • Contributing to Constructability Reviews and Site Logistics Evaluations Contributing to Project Risk Analysis Managing the Development of the Owners Program Construction Schedule and B.I.M. Managing the tracking and implementation of changes in the contract documents Developing Construction Management Plan and Procedures Manuals • Developing Specification language for Cost and Schedule requirements Preparing Monthly Progress / Status Report Managing the review of the contractors baseline and monthly update schedules Managing the estimation and negotiation of change orders Requirements: • Primavera scheduling experience ' P6 strongly preferred. • Change Order evaluation and negotiation experience. • Minimum years of experience: 15 • Education required: B.S. in Civil Engineering, Construction Management, or a related field Education preferred: Master's Degree in Civil Engineering, Construction Management, or a related field Registrations/Certifications preferred: P.E., CCM, PMP Special considerations, specific technical experience, skills, etc. • Must be fluent in English both written and oral

* There have been 0 Job applications
* This job opening has been viewed 936 times