Project Controls Manager

Project Controls Manager

Company:Contax Technical Recruitment
Email: chinahr@contax.ie
Career Level:Internship
Desired Education:NA
Number of Position:1
Travel:None
Work Experience:12
Job Type:Full-Time
Document: NA
Salary: $
Asia China Shanghai, China
Full-Time
Apply before: 27 Dec, 2010

About this job

 

Senior Project Controls Engineer with minimum of 10 years experience. This is a senior position with a client interface and an interface with corporate management.  Candidates will be required to produce high quality reports and documentation in a timely manner to meet project and corporate reporting requirements.
 
Candidates should be resident in China
 
Successful candidate will report to the Operations Manager.
 
Specific Experience / skills
Candidates should have experience of
·         Large A/E and CM environment
·         Process engineering work environment
·         Major Projects – (Detailed Design > 100,000 man-hours; CM > €100m)
Candidates should be familiar with and be capable of implementing
·         Project Cost Management systems
·         Change Control systems
·         Earned Value Progress Reporting
·         Critical Path analysis scheduling
·         Corporate Cost reporting
·         Standard contract conditions
A high level of IT aptitude is taken as a pre-requisite.  The candidate should be a competent user of the following specific packages
·         Primavera (P3)
·         Microsoft Excel
·         Microsoft Word
·         Microsoft Powerpoint
·         Microsoft Access
·         Microsoft Project
The candidate should also have good presentation skills.
 
 
Responsibilities:
Responsibilities will include but not be limited to
- Support to Business Development
  • Preparation of costs plans for inclusion in proposals (Engineering & CM)
  • Preparation of Project Controls presentations (for proposals)
  • Preparation of indicative project schedule for Proposals
 
- Support to Projects
  • Project Cost Report preparation
  • Project Monthly Progress Reporting
  • Project Schedules
  • Presentation of Project Cost and Schedules to client and project team
  • Implement project progress management using Earned Value system
  • Interface with Accounts team for preparation of invoices
  • Change Order preparation, submission and negotiation
  • Claims preparation as required
 
- Corporate Reporting
  • Prepare Monthly Corporate Project Status Reports (PSR’s) with Project management
  • Present Cost / Schedule to corporate management on quarterly basis
  • Prepare Project Financial Status Report (with Accounts) on a quarterly basis


* There has been 1 Application for this position
* This job opening has been viewed 875 times