Forum

  • Page:
  • 1

Examples of High Level Reports from P6/Excel for Board of Directors

OFFLINE
Joined On:
30 Sep 2017

Examples of High Level Reports from P6/Excel for Board of Directors

6 November 2013 10:02
Fellow Project Controllers, I have recently moved into a project controls role where I will be reporting on a number of projects on a monthly basis to the Board of Directors. I was hoping that somebody could enlighten me with some guidance/examples on the type/content of reports that can be generated from Primavera P6 or Excel that could be suitable for an overview at a high level. Is there a sample dashboard that could be used for the above? I would be very interested to see what methods are in use in the industry. Your help would be very much appreciated. Conor
  • Page:
  • 1