Below is the list of selected Project Controls literature in paperback verions suggested by our members. If any member wish to add a document here, please contact us and we will post the same after being reveiwed by our team members.
Practical Cost Control Handbook for Project Managers: A Practical Guide to Enable Consistent and Predictable Forecasting for Large, Complex Projects by Jeremy Avers
Integrated Cost and Schedule Control for Construction Projects by Frederic W. Mueller