Job Zone

Welcome to PCO's JobZone!

Jobseekers

Recruiter

  • Register & Advertise your postings for FREE*
  • Upload your company logo
  • Real time job applications
  • Join our Directory as one of the Recruiters
  • Access exclusive features for £9.99 per month
  • More.....

Featured Recruiters

Search Jobs

-->
Submit Unsolicited CV/Resume
Internship
Looking for someone with IT scheduling experience, preferably on light rail control systems.
Posted On 01 Aug, 2010
ICS-Global
$ 120000
Accounts
Internship
 Good knowledge of P6 scheduling software. E&C experience a must, international preferred but not mandatory, Must be able to visit job sites and offices to conduct cold eyes review on project schedules including report vs actual. SOFT SKILLS: Good communications as will be required to provide training to site project controls team/schedules while assessing their capability. Must be able to work with senior site management as well as interface with client Based in the Woodlands but 30% or more travel  
Posted On 31 Jul, 2010
CB&I
$ Direct Hire or Contract
Advertising
Internship
Type: Contract Position Overview:    Our Client, a leader in the Oil & Gas sector with assets throughout the continent, is currently seeking a Cost Scheduler. Reporting into the Project Controls group, the incumbent will be responsible for various costing and scheduling duties particular to the segment of the project assigned. Responsibilities: 1. Cost and schedule management for project assignment 2. Prepare schedule and cost reports for projects 3. Prepare and analyse cost reports and costing audits 4. Examine and review unusual cost records and ensures cost data is allocated correctly 5. Produce monthly reports related to the position 6. Perform and ensure an effective cost control function 7. Interpret contracts and manage financial risk, estimating and forecasting 8. Maintain current cost control database.  9. Review proposed schedule changes with construction personnel, client and contractors.  Requirements: 1. Technical Diploma or Degree , significant EPC or EPCM industry experience will also be considered 2. Advanced knowledge of Cost and Estimating software generally used on major engineering projects; Timberline, Prism, Primavera, etc.  3. Experience in the evaluation of contractors' baseline schedule and cost-loaded schedule, evaluation of cost impacts for contractor recovery schedules and the tracking of project costs to contract closeout 4. Pipeline Construction experience is desired  5. Motivated self starter 6. Able to work in a fast paced and rapidly changing environment 7. Effective interpersonal communication and organizational skill      
Posted On 31 Jul, 2010
Project Talent Acquisition Group
$ DOE
Aviation
Internship
 Type:  Full Time Position Overview: Our Client, a leader in the Oil & Gas sector with assets throughout the continent, is currently seeking a Planner/Scheduler Lead. The incumbent will be reporting into the Project Controls group for schedule development, monitoring and recovery plan development activities during engineering, procurement and construction phases of major capital projects. This position will also provide oversight for the client, while ensuring all contractors are keeping to schedule.  Responsibilities: 1. Interfaces with designated Company management and client counter parts for planning and scheduling tasks per PCM direction.  2. Responsible for collection, verification, and integration of works scope for all entities into the total project plan.  3. Performs timely and complete update of project schedules to determine contractor performance compliance with approved baseline.  4. Prepares and presents projects schedule analysis and conducts studies of problem areas to determine critically of schedule activities.  5. Recommends alternatives for schedule improvement to project team for discussion and/or decision.  6. Leads the development of scheduling standards and procedures.  Number of Jobs: 1  
Posted On 31 Jul, 2010
Project Talent Acquisition Group
$ DOE
Advertising
Internship
Project Control Manager, Petrochemical £Competitive Salary + Package Hampshire, UK My excellent client is a Leading global supplier of management, design and construction services for major projects spanning Metals and mining, Chemicals, polymers, syngas and refining LNG regasification, Power generation and Nuclear decommissioning. They design products and services to have no undue environmental impact, to be safe and to be efficient in consuming energy and natural resources. We seek to ensure that our products can be recycled or disposed of safely. The Project Control Manager will hit the ground running working on some fantastic international projects. You will lead in establishing and maintaining comprehensive planning, cost man-hour and resource management data to support the Project management team on one or more Projects. Further as Project Control Manager you will provide Project Control input to tenders and presentations to clients and actively promote the development and training of Project Control staff. To fit the job you must have Project Control Management experience with a petrochemical engineering background and time spent within a planning and cost engineering, procurement and construction background.
Posted On 30 Jul, 2010
Executive Recruitment Services
$ Competitive
Accounts
Internship
 S.R. Clarke is seeking a scheduler for a general contracting company. Candidates must have experience overseeing multiple offices and have the ability to train and mentor junior schedulers. Primavera P6 and SureTrack are a must. Candidates must be willing to do some travel to offices. Claims experience is a MUST for this positions. Location is not an issue, as relocation can be negotiated for the right candidate.
Posted On 30 Jul, 2010
S.R. Clarke Inc
$ DOE
Advertising
Internship
 Lead the development of a CPM Network for assigned complex offshore/subsea projects, that meets all business requirements and uses P6 Keep the CPM Network updated and keep a constant communication loop open with the project’s manager. Provide critical analysis of engineering, vendor and subcontractor’s schedule Participate in new work processes (cost/schedule) to enhance the project controls deliverables Perform Risk Analysis (Cost/Schedule) as required. Provide Project Controls support to Proposals Group and FEED Studies as needed. Work to develop standardization of schedules.
Posted On 30 Jul, 2010
Innovative Management Solutions
$ DOE
Advertising
Internship
Project Controls (2 positions open) - Planner/Scheduler and Cost Engineer. US work authorization required Our highly successful Houston based Engineering and Oil and Gas Operating clients are searching for a Project Control Professionals with recent Upstream Oil & Gas experience.   This would be a full time staff position with excellent salary potential, full company benefits with signing/annual bonuses.   Required skills:   Planner/Scheduler - 5+ years with recent Offshore Production Platform experience.   Cost Engineer - 5+ years with recent Offshore Drilling experience.   Please forward a copy of your resume and/or contact me if you would be interested in learning more about the positions.
Posted On 30 Jul, 2010
Energy Staffing professionals
$ DOE
Civil / Building
Internship
 We currently seek a high calibre Principal Project Planners to join our client's team of experienced professionals on a contract basis. We have URGENT roles based in London and Reading paying a contract rate of upto £400 per day. You will be required to lead the planning function within project team, providing guidance and direction to project teams, and assuring quality and consistency of all planning and associated reporting. You will have knowledge and/or experience of the following: Being delivery focused as you will be supporting and providing solutions for the project manager, working on highly complex programmes of work Providing leadership, technical expertise, support, and direction to the planning community Developing project plans in accordance with GRIP Ensuring project plans are fully resourced and cost loaded and monitor progress to the plan Earned Value Analysis You must have experience of: P3e/P6 Planning and delivery of major construction & engineering projects, preferably within the UK rail sector Oracle Projects especially the P3e/OP Interface Supervising Project Planners The successful applicant will be a genuine team player, who can offer support and guidance to others as well as assist in delivering a significant workload. To apply for this opportunity, use online via the link below.
Posted On 30 Jul, 2010
TRS Staffing
$ GBP 400/day
Advertising
Internship
 A national engineering and construction main contractor are looking to appoint a Planning Engineer to be based in their Nottingham office. This multi discipline contractor provides a range of services to rail, energy and engineering industries and value themselves on their renowned record for safety, quality and industry integrity, along with an excellent reputation. The Role The primary function of the Planning Engineer is to implement and manage the planning and programming activities to meet the project objectives efficiently and within deadline. Project will be within the transmission and distribution market and will include the refurbishment or renewal of over head lines. Responsibilities You will also have direct contact with clients, production of design programmes, attendance to tender meetings. Optimise and implement construction planning and programmes (including resources, outages, consents and wayleaves) in conjunction with interested parties to deliver the work. Work with the planning manager to define; produce and maintain the planning and project controls procedures; this should extend to working with the Quality Assurance function to ensure that the procedures are being adhered to. Take a lead role in developing the tender/bid programmes , including organising and chairing the programme related meetings i.e. Interface meeting ; programme sign off meeting etc. Requirements All applicants will need to demonstrate and possess the following to be considered for the role: Minimum HND/HNC or higher qualification Background with multi discipline projects for main contractors Experience working within the energy, rail or utilities markets IT & Primavera P6 software proficient Pro active with a flexible attitude Ability to communicate effectively at all levels The Package In return the successful Planning Engineer can expect: Competitive Salary Health Insurance Contributory Pension Scheme 25 days Annual Leave plus Bank Holidays  
Posted On 30 Jul, 2010
Resourcing Solutions Limited
$
Advertising
Internship
A large multinational construction business currently has an urgent requirement for a Senior Planner to take on a client-facing role in Central London. Our client are looking to interview w/c 19th July for an end of August start. The role will be based 4 days per week in Central London with one day spent in Farnborough (Hampshire) in the client offices. The client is a global corporate business with offices across the globe and you will be specifically responsible for all building projects, with schemes likely to include new build, refurb, fit-out, moving offices, etc. Working in the project management office, your role will involve creating detailed project programmes, monitoring/updating progress, progress reporting, critical path analysis, liaising with clients, troubleshooting, etc. Ideally, the successful candidate will have the following experience: - Significant construction planning experience. - Proficiency with Asta Powerproject software. - Experience on office/commercial schemes would be an advantage, not essential. - A relevant engineering/construction degree would be advantageous. - Good communication skills and ability to work in a client-facing environment. - Eligible to work in the UK. In return, our client will offer a salary of up to £55,000 per annum plus car/allowance, pension, health, etc. Apply now for further benefits. Services advertised by Project Resource are that of an employment business and/or agency.
Posted On 30 Jul, 2010
Project Resource
$ 55000
Advertising
Internship
 Our client is looking to increase the Dept and have an urgent requirement for 2 x Project Controls Engineers to work on ongoing projects. The successful applicants will have at least 10 years experience with EPC Companies based in the UK working on various Oil&Gas/Petrochem projects and have all aspects of cost, planning and scheduling experience in both on and offshore projects. Primavera P6 exp required  
Posted On 29 Jul, 2010
petrolic Limited UK
$ 60
Advertising
Internship
  Engineering Expert Witness for a 12 month infrastructure project in the Middle East. Contact us for more details. 
Posted On 24 Jul, 2010
Gold Group
$ DOE
Chemical / Petrochemical
Internship
Rate: $120000 per annum Extras: Accommadation + Flights + Bonus ( Discretionary and Guaranteed) : Type:  Permanent ; Required Residency: EU/UK   Job Description: Job Title – Project Controls Manager Location – Sharjah, UAE Job Description – Working on Oil & Gas Projects Requirements - Project Controls Experience 15yrs+ Oil & Gas Background EPC Experience Essential Contractor Background UAE Experience Preferred
Posted On 23 Jul, 2010
Anderson Young Limited
$ $120000 + Benefits
Accounts
Internship
 Cost Controller required by my client based in East Norfolk. Previous experience in a similar role is essential, as are excellent excel skills and attention to detail. The role will require a confident communicator, both face to face and via the phone, email etc, as there will be a lot of interaction with both internal and external clients. Experience of managing project budgets, advising on spend and liaising with senior management would be of great advantage. Experience of working within the oil/gas industry is prefered  Due to the high volume of CVs we are currently receiving, unfortunately it is not always possible to contact all candidates individually. If you have not been contacted within 5 working days, and your skills do not match the position, please assume you have not been successful in your application.
Posted On 22 Jul, 2010
Select Recruitment
$
Aviation
Internship
Both the staff and contract options available for this position  Role & Duties  §  Developing Project Controls section to the PEP. §  Responsible for the Project Controls team when required on a project. §  Updating the proposal schedule to indicate specific milestones agreed upon in the Contract. §  Identifying special project cost instructions and incorporate them into the project cost report system. §  Assisting with obtaining alignment between Engineering and Procurement Schedules. §  Assisting with obtaining scheduling alignment with key construction activities. §  Ensuring that Corporate Systems are set up and maintained in line with project schedules and changes. §  Assisting with development of Design Change Notices by highlighting impact on schedule, and assist with related tracking and re-base lining effort. §  Assembling, analysing and projecting of project progress, costs, and man-hours including planned, actual and forecast figures. §  Translating estimate costs into a project budget segregated by Mustang’s code of accounts. Periodically reporting progress and cost trends and propose action plans for remediation.
Posted On 22 Jul, 2010
TS International
$ Staff & Contract options
Advertising
Internship
  You will be working for a leading German utility that specialise in Power Plant engineering, construction, commissioning and operations. You will be very familiar with planning tools such as Primavera You will speak German Duration: Holland: Assignment 1 – You will be working for a leading Dutch Oil & Gas engineering contractor who specialise in the offshore sector. Strong familiarity with planning systems, planning integration, full level detailed planning Strong software experience Duration: At least 6months in Dutch head office, potentially longer Assignment 2 - You’ll be working for a large engineering consortium made up of several specialist Oil & Gas contractors focussing on projects for Shell. Experience with Primavera, Databases, Excel macros, Knowledge of how to execute shut downs would be advantageous. Linked closely to a risk analysis role At least 1 year (renewable)   Germany:
Posted On 21 Jul, 2010
Janikin Rooke Contracts Ltd.
$ DOE
Advertising
Internship
 Urgent Requirement for Cost Engineers  Our client currently has an urgent requirement for Degree Qualified Cost Engineers with Major Civil experience. As one of the largest EPC contractors in the world they are in currently working on a number of key international infrastructure projects all above the $1bn mark. Their project control team is currently looking to recruit a number of individuals from Cost Engineer to Lead Cost Engineer.  Package Details:  £50,000 - £80,000 Salary  Accommodation Allowance  Vehicle Allowance  Healthcare  Return Flights Home. 
Posted On 21 Jul, 2010
Randstadcpe
$ DOE
Aviation
Internship
Project Control Manager, Petrochemicals ££ Competitive Salary + Package ££ Hampshire This is a great opportunity for Project Control Manager to join an impressive EPC specialist who provides services to a long list of clients and offering a full turnkey solution under a single project management control. Having won a number of large projects and existing work on offer, this is a chance to be part of this forward thinking international engineering company. The Project Control Manager will hit the ground running working on some fantastic international projects. You will lead in establishing and maintaining comprehensive planning, cost man-hour and resource management data to support the Project management team on one or more Projects. Further as Project Control Manager you will provide Project Control input to tenders and presentations to clients and actively promote the development and training of Project Control staff. To fit the job you must have Project Control Management experience with a petrochemical engineering background and time spent within a planning and cost engineering, procurement and construction background. Apply now by send your CV to david_l@ers.co.uk or call David Lichtenstein on +44 (0)1923 225581.
Posted On 20 Jul, 2010
ERS
$ 60000
Accounts
Internship
Senior Cost /? Estimating Engineer, Long term contract (2 years)/? Holland £45.?00 - £55.?00 GBP per hour ALL INCLUSIVE RATE.? Our prestigious global engineering client is currently to recruit a Senior /? Lead Cost /? Estimating Engineer to join their long term project in Holland.? The ideal candidate will have a strong power generation background and have been in a Senior /? Lead role for a reasonable time to date.? Estimated hours available - 40 - 60 per week.? Start date Aug/?Sept 2010.? The project is a power station new build and this role is urgently required.? More details will follow, how interested engineeers are encouraged to contact us ASAP Degree minimum /? Salary will be negotiable depending on experience.?.?
Posted On 16 Jul, 2010
Kelly Services Limited
$ DOE
Aviation
RSS Feed:   All categories