Project Controls Expo, London 2013 - London, 13 Nov 2013

Project Controls Expo, London 2013 - London, 13 Nov 2013

London Expo Presentations 2013

Master Class Zone 1:
Presentation Title Speaker File Size Download Watch
No Project Controls without a good cost estimate Martin van Vliet, Sr Cost Engineer at Cost Engineering Consultancy BV, Holland 3.2mb
Managing Risk in Programs Dr David Hillson, Director at Risk Doctor and Partners, UK 4.3mb
Project Controls - The Human Factor Breda Ryan, Project Controls Manager at Jacobs UK 1.6b
Portfolio Risk Management Jim Morrison, Principal Consultant at Rhead Group 435kb
Forensic Schedule Analysis - How to find the truth Ewen Maclean, Principal, Berkeley Research Group 677kb
Integrated Project Planning/ Scheduling Within an Enterprise Environment Gero Renker, Director of Program Framework UK 5.8mb
A new visual way to engage executive stakeholders Sarim Khan, Principal Consultant, Sharpcloud, Norway Øyvind Røberg, Product Strategy Manager, Safran AS, Norway 1.1mb
Risk and Planning, how to use the QSRA process to intelligently apply risk to planning without affec;ng Earned Value Management Speaker: Simon Taylor, Head of Planning at TFL (Transport for London), UK 1.8mb
Technical Zone:
Presentation Title Speaker File Size Download Watch
Collaborative Project Controls with Oracle Primavera Unifier Tony Fulton, Oracle Rhys Priestman, Solutions Architect, Enstoa   Not available due to IP issues
Challenges in Project Controls Jim Malkin, Director IPM-Deltek 2.4mb
Creating Confidence in Delivery through Project Controls Andrew Hill, Managing Director, LogiKal Projects 1.7mb
EVM for the Rest of Us Javier Sloninsky, CEO at EcoSys, USA 6mb
Optimizing project performance: why an integrated PMB is greater than the sum of it's parts. Simon Johnson, Principal Consultant, Ares Corp   Not available due to IP issues
Improving the Reliability and Achievability of the Project Plan Phil Shatz, Regional Manager at Acumen Europe, UK (part of Deltek now) 6mb
Creative Destruction: How Big Data and Tech Will Change the Project Controls Profession Jordan Cram, CEO at Enstoa, USA   Not available due to IP issues
Loading Cost and Activity data into Primavera; a low cost, flexible tool for planners and engineers. Dave Kelly, Primavera Expert, Collabro Group Representative 1.1mb
Master Class Zone 2:
Presentation Title Speaker File Size Download Watch
Integrating Risk and Earned Value Management Joan Langley, Principal Consultant at BMT Hi-Q Sigma UK 1.4mb Not available due to IP issues
To baseline or Not to Baseline – What should be the basis ? David Birch, Head of Project Controls at National Grid UK 884kb
The Agile PMO Michael Nir, Founder & President at Sapir Consulting, Israel 11.2mb
Megaprojects: Experience from an Oil & Gas Contractor - Status and Way Forward Patrick Kennerson, Programme Controls Director, Mott MacDonald UK   Not available due to IP issues
Harmonise best practise for managing projects and maintenance activities in an IT and Engineering department of Arcelor Mittal using just one tool: Sciforma 5.0 Rebecca Leadbitter, Sciforma, speaking on behalf of Laurent Baudouin, Project, Methods and Tools support, Arcelor Mittal   Not available due to IP issues
Case Study: From Cost Plan to Bid Evaluation to Contract Administration – The Earned Value Project Control Cycle Roland Horat, Managing Director at SuperTech International, Australia 8.2mb
NA - Not available due to copyright/data protection reasons