E-Library

Time Impact Analysis

Uploaded by
Unplanned delays on a construction project are often regrettable but unavoidable. If the General Contractor has been harmed by the effects of an event beyond his ability to reasonably foresee and plan for in his bid, then the Owner should adjust the contact in a fair and equitable manner. It is desired that this adjustment to the contract be accomplished as quickly and with the least amount of effort as possible. Read more by downloading the document..
Library
34 KB
857 times
280 times
May 02, 2017 09:44:57
May 02, 2017 04:14:57