Below is the list of selected Project Controls literature in paperback verions suggested by our members. If any member wish to add a document here, please contact us and we will post the same after being reveiwed by our team members.
By David Hulett It contains a complete treatment of schedule risk analysis from basic to advanced concepts. The methods are introduced at the simplest level and are then progressively elaborated.
Integrated Cost and Schedule Risk Analysis by David Hulett