Blogs

An overview of Trace Logic in Primavera P6

Tuesday, 27 November 2012
Hits: 1060

In the blog post created by MSS Projecst Analytics about Trace logic  you learn why you should use Trace Logic and how to use this feature while working in Primavera. You can access the full article by visiting the main blog here: http://mssprojectsanalytics.com/blog/bid/245300/How-to-use-Trace-Logic-in-Primavera-P6

Trace Logic is a great tool available in Primavera P6 that allows you to step or “trace” forward or backward through a series of activities in order to view or focus on predecessor/successor relationships. Trace Logic can be displayed as a Bottom Layout in the Activities window. The Trace Logic tool displays relationships for an activity that you select in the Activity Table, Activity Network, Activity Usage Spreadsheet, or the Gantt Chart displayed in the Top Layout. The selected activity will be displayed as a box with a blue border that enables you to quickly focus on its predecessor/successor relationships. Critical activities will be displayed with a red border around the activity box. Lines connecting the activity boxes denote activity relationships.

Uses of the Trace Logic feature in Primavera P6?

Trace Logic can be used by project managers and schedulers to review an activity’s predecessors and successors. Trace Logic makes it easy to examine why an activity is scheduled to occur at a particular time helping you to determine if an activity’s predecessors were delayed or if existing constraints are still applicable. You can quickly evaluate if relationship types portray the sequence in which the activities should occur. For example, you may notice that a Site Prep activity can have a “start to start” relationship with its Excavation successor versus “finish to start”.

This Primavera P6 tutorial provides instructions for displaying and customizing the Trace Logic.

Step 1: Open a project & select a layout. The layout selected below is “Current versus Baseline Bars”. Notice that BA2020 Excavation activity started late, has a work stoppage as evidenced by the “bar-neck”, and finished late when compared to its baseline. We will use Trace Logic to determine the possible impact on successor activities.

 Primavera p6

Continue to the full article: http://mssprojectsanalytics.com/blog/bid/245300/How-to-use-Trace-Logic-in-Primavera-P6

Trending #Tags

Search Blogs

Archived Posts