This is a place for Registered Users to share their technical view and opinions in form of blogs which they think might be useful to the greater PCO community. We invite prolific writers to share their insights and witticisms, but remind all contributors to be mindful of any copyright rules. ProjectControlsOnline will not be held responsible for any breach in rights and responsible users will be held accounted for the same.

How to Download Primavera P6 Professional

Jun 20
Go to the following website: https://edelivery.oracle.com Select “Sign In”. Enter your username and password In Search by box, type “primavera professional”. An suggestion dialog appear, select “Primavera P6 Professional Project Management 16.1” ..
Hits: 2023

How to install Primavera P6 Professional 16.1 Stand-alone

Jun 20
After downloading the installation file from Oracle, unzip it. Click on Setup Select “Typical” and click OK Click Install After installation complete, click OK. In Driver type drop-down list, select “P6 Pro Stand-alone (SQLite)”, t..
Hits: 1285

Planning & Scheduling rules/principles

Jul 29
Let us first understand the terms i.e., planning & scheduling: Planning is control of time on a project by: Project Plans which optimise expenditure of time, recognise cost implications and reflect the contractual obligations for the design, procurement, construction and co..
Hits: 1242

Capital Cost Optimization On Gas Fired Power Projects Through Standardization

Jul 29
Abstract Across the globe, research is being done to reduce the capital cost of power projects to ultimately reduce the cost of unit power supplied to end consumer. This paper attempts to identify one of the ways of capital cost reduction i.e., by designing and executing multiple power project..
Hits: 748

OPTIMIZING ENGINEERING PERFORMANCE ON A CAPITAL PROJECT - A COMPREHENSIVE APPROACH

Jul 28
TABLE OF CONTENTS 1.0        Introduction ……………………………………………………1 2.0        PERFORMANCE M..
Hits: 1235

Criteria required for Risk schedule

Jul 28
We are often asked about what are criteria for building Risk schedule. In other words, what factors needs to be taken into consideration while building a risk schedule on which risk analysis will be performed. Here is the plan check list which you may find it helpful - Be between 50..
Hits: 678

IMPORTANCE OF SCHEDULE DELAY ANALYSIS ON CONSTRUCTION PROJECTS – A CONTRACTOR’S PERSPECTIVE

Jul 28
TABLE OF CONTENTS 1.           INTRODUCTION…………………………………………………….…..…1 2.  ..
Hits: 3451

New Approaches to Level Scheduling

Apr 23
One of the most important considerations of project planning is the scheduling of a project at the right level, at the right time – and that can be challenging. Executive-level and senior-level management scheduling have different needs and goals than stage- or phase-level scheduling, which ma..
Hits: 753

Scheduling and the ‘Progress Override v Retained Logic’ Conundrum

Apr 08
Scheduling and the ‘Progress Override v Retained Logic’ Conundrum With the growing use of project management software to analyse construction delays, comes the often overlooked question – how does the software really work? This is of course a pretty meaty query and way too b..
Hits: 1750

Microsoft Project : Custom View (New view) appear in all Project (2)

Feb 16
When you need to customize a View and save it for later use, sometimes we only need that View for a certain Project. However by default Microsoft Project always save New View to Global template, and it will appear in all project. This can cause problem because day by day the list of View will increa..
Hits: 915