Blogs

How to display multiple windows at once in Primavera P6 Release 8.2

Monday, 21 January 2013
Hits: 2352

Increase your productivity in Primavera P6

One thing that you can always be certain of with Primavera P6, you can always learn more.  There will always be new features and functionality in each new release that you did not know existed. One question that we always hear from students in our classroom based Primavera training is if they can have more than one window or tabs opened while working in P6. Today we are going to illustrate how to use multiple windows/tabs and tiles in Primavera P6 Professional R8.2.

Did you know you could display vertical and horizontal tiles in Primavera P6 Release 8.2?

Primavera P6 eppm

Primavera P6 Release 8.2 has two new features that will help improve your productivity. The first feature is the ability to open multiple windows/tabs (such as the Activities and WBS windows), and the second feature is the ability to tile the windows horizontally or vertically by opening multiple tab groups. To view the full article and learn how to streamline your tasks while using the software read the full article here: http://mssprojectsanalytics.com/blog/bid/242584/How-to-display-multiple-windows-at-once-in-Primavera-P6-Release-8-2

Trending #Tags

Search Blogs

Archived Posts